Boiler Plant Optimization

Boiler Plant Optimization

Cleaver-Brooks Boiler Plant Optimization Specialist medallion

Energy Control has factory-trained certified technicians to perform Boiler Plant Optimization (BPO) assessments. A BPO is an evaluation of the boiler room based on 4 pillars of optimal plant operation: efficiency, sustainability, reliability and safety. The result, the BPO plan will outline energy-saving opportunities and discovery for emissions reduction through retrofits, rebuilds and upgrades.

The Boiler Optimization Plan will include:

  • Site visit to record the current state of your boiler room equipment
  • A high level review of plant utility records
  • A detailed report outlining key areas related to deficiencies that need to be corrected in order to further optimize boiler plant operations.
  • Roadmap for improvement

Schedule a free Boiler Plant Optimization assessment today.

Steam Trap Surveys

Technician performing a steam trap survey

Improve safety and production reliability with a trap survey. Defective traps with blockages, leaks or other issues can lead to a potential for water hammer, wasted energy and can turn into larger problems over time.

Ensuring steam traps are operating properly is key to the efficiency of your steam system.

TrapMan: Steam Trap Diagnostic Tool

  • An accurate and reliable analyzer from a 3rd party authority
  • Steam loss qualification indicating the steam leak amount and monetary steam loss determination

The Trap Survey will include:

  • A site visit to perform an analysis of the current working condition of your steam trap system.
  • A detailed report indicating the results of the test, recommendations and payback analysis

Contact us to request a quote for a trap survey.

Ready to discuss your boiler room?

Contact