|
|
||||||||
|
YOUR SOURCE FOR BOILER & BURNER SYSTEMS |
||||||||
|
Call Us: 888-893-0284 |
||||||||
| Boiler Equipment | Burners | Parts | Energy Recovery | Rentals | Service | Contact Us | ||
|
|
||||||||
Level Master InstallationsMennel Milling - Fostoria, Ohio |
||||||||
|
|
Mennel Milling's boilers had Magnetrol ® W-25 low water cut offs and high water alarms which contain mercury switches. The feedwater was controlled by a pneumatic Magnetrol Modulevel ® level control operating a Fisher ® pneumatic globe valve. | |||||||
|
|
With the level Master we were able to eliminate the mercury which is becoming more of an issue every day. We were also able to combine the feedwater control with the low water cut off in one control, saving valuable space in a tight boiler room. | |||||||
|
|
To make more room between the boilers, the Level Master was placed on the other side of the boiler. All of the piping on the control panel side was eliminated. An I-P transducer was added to the Fisher pneumatic valve so that it could be reused. Installation took one day. | |||||||
![]() |
With the blowdown over-ride button, an operator can perform his main water column blowdown successfully without having the boiler shut down. At Mennel Milling this is extremely important. In the past testing the auxiliary low water cut off properly required jumping out the main control. With the simple push of a button the Level Master makes testing the auxiliary low water control easy. | |||||||
|
|
||||||||
|
|
YOUR SOURCE FOR BOILER & BURNER SYSTEMS |
|||||||
|
Call Us: 888-893-0284 |
||||||||
| Boiler Equipment | Burners | Parts | Energy Recovery | Rentals | Service | Contact Us | ||